📁 Sangam Dhakal - Portfolio v2.0 - Netscape Navigator 4.0
_
□
×

📚 Interview question

How do you set incident severity levels and triage an incident? Explain how you judge impact and urgency, what a Sev 1 versus a Sev 3 looks like, who gets called for each, and what the incident commander does (and doesn't do).

Covers severity scales based on customer impact, triage questions, escalation and paging by severity, the incident roles (incident commander, operations lead, communications lead, scribe) and communication cadence.

Intermediate Theory Intermediate incident-commander incident-response observability on-call severity-levels triage

🎯 Key points

  • Severity is set by customer and business impact, not by technical cause
  • Impact x urgency: breadth of users, critical function, data or security risk, getting worse
  • Severity definitions written, agreed by the team and linked from every runbook, with examples
  • Sev 1: on-call + secondary, IC, comms lead, execs; status-page updates every 30 minutes
  • Incident commander coordinates and decides; does not debug
  • Roles: IC, ops/tech lead, comms lead, scribe — the scribe's timeline feeds the postmortem
  • When in doubt declare higher and downgrade later
  • Security or personal-data incidents bring in security/privacy (NDB scheme assessment)

⏱ 30-second answer

Severity describes customer and business impact, not the technical cause: how many users, which function (checkout versus a report), whether data or security is at risk, and whether it is getting worse. Teams write down 3–5 levels with examples — a Sev 1 is 'checkout down for everyone' or 'personal data exposed', a Sev 3 is 'one admin report is slow'. Severity then decides who is paged, which roles are filled and how often you communicate.

For anything Sev 2 or above, one person becomes the incident commander (IC): they own decisions, roles and communication, and deliberately don't debug. An ops lead investigates, a comms lead updates stakeholders, a scribe keeps the timeline. Rule of thumb: declare high and downgrade — the cost of over-staffing for 20 minutes is small compared with an under-staffed outage.

🗣 Full answer (senior)

How I would answer this in an interview

"Severity is about impact on customers and the business, never about how interesting the bug is. When I triage I ask four things: how many users are affected, how important is the function — can people pay, log in, see their data — is there any data loss, security or privacy risk, and is it getting worse. Those answers map to written severity levels. A Sev 1 is something like checkout failing for everyone or personal data exposed; a Sev 2 is a major feature degraded for a large group, or a Sev 1 we've worked around; a Sev 3 is limited impact with a workaround; a Sev 4 is cosmetic or internal.

Severity drives everything after it. Sev 1 pages the on-call engineer, the secondary, the engineering manager and an incident commander, opens a bridge, and puts updates on the status page every 30 minutes. Sev 3 is a ticket for business hours. If personal information may be involved, security and the privacy officer join straight away, because under the Notifiable Data Breaches scheme you have to assess a suspected eligible breach quickly — within 30 days at most.

The incident commander's job is coordination: they keep the picture of what's happening, assign roles, decide on mitigations, and make sure communication goes out. They don't open a debugger, because the moment the IC starts debugging nobody is watching the whole incident. The mistake I see is teams arguing about whether it's 'really' a Sev 1 for fifteen minutes. I'd rather declare high and downgrade — over-staffing for twenty minutes is cheap."


A typical severity scale

Severity Example Who is engaged Communication
Sev 1 — critical Checkout or login down for most users; data loss; personal data exposed On-call + secondary, IC, comms lead, EM; security/privacy if data involved Status page and execs every 30 min
Sev 2 — major Key feature degraded for a large group; Sev 1 with workaround On-call + IC, comms as needed Stakeholders every 60 min
Sev 3 — minor Limited users, workaround exists On-call in business hours Ticket updates
Sev 4 — low Cosmetic, internal tooling Backlog None

Triage questions

Question Where the answer comes from
How many users? Application Insights requests failure count by user/tenant, support volume
Which function? Failing operation names, synthetic test results
Data or security risk? Error types, audit logs, security alerts
Getting worse? SLO burn rate, trend over the last 15 minutes
What changed? Deployment history, config changes, feature-flag audit

Incident roles

Role Does Doesn't
Incident commander Owns decisions, assigns roles, sets update cadence, declares resolved Debug or type commands
Ops / technical lead Investigates and runs mitigations Field stakeholder questions
Communications lead Status page, support, executives Speculate on root cause
Scribe Keeps timestamped timeline in the channel Make decisions

In small teams one person may hold two roles, but IC and hands-on debugger should be different people for anything serious.

Production example

A Sev 2 was declared when 15% of logins failed with token errors after an identity provider certificate rollover. The IC paged the identity team, the comms lead posted a status update within 10 minutes, and the ops lead rolled the signing key configuration back in 22 minutes. Separating the roles meant support had accurate updates while engineers stayed focused.

🔍 What the interviewer is checking

Checks whether the candidate can size an incident by impact, knows who to involve, understands the incident commander role, and can work with others under pressure.

Green flags

  • Severity defined by customer impact with agreed, written examples
  • Clear escalation and update cadence per level
  • IC coordinates and doesn't debug; roles hand off cleanly and talk through one channel
  • "Declare high, downgrade later"
  • Brings in security/privacy for data incidents

Red flags

  • Severity based on how hard the bug is
  • Everyone jumps on the bridge and debugs, nobody leads
  • No mention of communicating with customers, support or the other responders

📚 Learn in depth

1. Impact and urgency

Most scales come from ITIL's idea of priority = impact × urgency. Impact is how many users and how important the function is; urgency is how fast it gets worse and whether there's a workaround.

               urgency ->
             low        high
impact  high  Sev 2      Sev 1
  |     med   Sev 3      Sev 2
  v     low   Sev 4      Sev 3

Common impact categories, from most to least serious:

Impact category Example for a .NET commerce platform
Safety, security or personal data Customer records exposed, credentials leaked
Money movement Payments failing or double-charging
Core journey blocked Login, search or checkout unavailable
Core journey degraded Checkout p95 at 6 s, some retries succeed
Secondary feature Recommendations or order history missing
Internal only Admin report slow

Common urgency categories:

Urgency Meaning
Immediate Getting worse now, no workaround, or a deadline (payroll run, end-of-month billing)
Short term Stable but customers notice; workaround is painful
Can wait Workaround exists; fix in business hours

The matrix is a guide; the written examples matter more because people decide by comparison under pressure.

2. Why the IC doesn't debug

Debugging needs deep focus on one thread. Coordination needs a wide view: is the comms update due, is the database team joining, has anyone checked the other region? One brain can't do both under stress. This idea comes from emergency services' Incident Command System, adopted by Google SRE and PagerDuty's incident response guide.

3. Escalation paths

alert -> primary on-call (ack within 5 min)
            | no ack
            v
         secondary on-call
            | Sev 1 or Sev 2 declared
            v
         IC rota + EM + comms lead
            | data/security involved
            v
         security lead + privacy officer

Paging tools (PagerDuty, Opsgenie, Azure Monitor action groups to a paging service) implement the timeouts.

4. Communication cadence

Regular updates, even "no change, next update in 30 minutes", stop stakeholders interrupting the responders. A good update says: what is affected, what we are doing, what customers can do, when the next update is.

5. Documentation during the incident

The scribe's timestamped log in the incident channel — severity changes, hypotheses, actions and their effect — becomes the postmortem timeline. Without it, the review relies on memory and the triage decisions can't be examined.

6. Privacy and security incidents in Australia

If personal information might have been accessed or disclosed, the Privacy Act's Notifiable Data Breaches scheme applies: assess a suspected eligible breach promptly (within 30 days) and notify the OAIC and affected people if it's likely to cause serious harm. Triage should flag this early so evidence is preserved.

Try it yourself

  1. Write a four-level severity table for your current system with two real examples per level.
  2. Write a KQL query that counts distinct affected users for failed requests in the last 30 minutes.
  3. Draft a status page update template: impact, action, workaround, next update time.
  4. Run a 30-minute tabletop exercise where one person is IC and is not allowed to touch a keyboard.

💻 Code

Severity rules written as code so a paging bot or runbook tool suggests a severity the same way every time. The IC can still override it.

namespace Incidents;

public enum Severity { Sev1 = 1, Sev2, Sev3, Sev4 }

public sealed record ImpactAssessment(
    double AffectedUserFraction,   // 0..1, from telemetry
    bool CriticalJourney,          // checkout, login, payments
    bool DataOrSecurityRisk,       // personal data, data loss
    bool WorkaroundExists,
    bool Worsening);

public static class SeverityPolicy
{
    public static Severity Suggest(ImpactAssessment a) => a switch
    {
        // Data or security risk is always treated as top severity.
        { DataOrSecurityRisk: true } => Severity.Sev1,
        { CriticalJourney: true, AffectedUserFraction: >= 0.25, WorkaroundExists: false } => Severity.Sev1,
        { CriticalJourney: true } => Severity.Sev2,
        { AffectedUserFraction: >= 0.25 } => Severity.Sev2,
        // Getting worse bumps a minor incident up one level.
        { Worsening: true } => Severity.Sev2,
        { AffectedUserFraction: > 0 } => Severity.Sev3,
        _ => Severity.Sev4
    };
}

Finding how many users are affected, to feed that assessment:

let window = 30m;
let total = toscalar(requests | where timestamp > ago(window) | summarize dcount(user_Id));
requests
| where timestamp > ago(window) and success == false
| summarize affectedUsers = dcount(user_Id) by operation_Name
| extend affectedFraction = round(1.0 * affectedUsers / total, 3)
| order by affectedUsers desc

⚠ Common mistakes

  • Mistake: Setting severity by technical cause ("the database is down, so Sev 1"). Why it is wrong: A down replica nobody uses has no customer impact. Instead: Set severity by who is affected and how.
  • Mistake: Long debates about the level before acting. Why it is wrong: Minutes spent arguing are minutes of outage. Instead: Declare high, downgrade later.
  • Mistake: The IC also debugging. Why it is wrong: Nobody watches the whole incident; comms and escalations get missed. Instead: Hand debugging to an ops lead.
  • Mistake: Severity levels without written, agreed examples. Why it is wrong: Each on-call engineer judges differently under stress. Instead: Keep a team-agreed table with two or three concrete examples per level, linked from the runbook.
  • Mistake: Not bringing in security or privacy when personal data may be involved. Why it is wrong: Evidence is lost and NDB assessment deadlines are at risk. Instead: Make 'data or security risk' an automatic escalation.
  • Mistake: No regular updates. Why it is wrong: Stakeholders interrupt responders for news. Instead: Fixed cadence, even when nothing has changed.
  • Mistake: Nobody documenting decisions during the incident. Why it is wrong: The postmortem timeline is rebuilt from memory and the triage calls can't be reviewed. Instead: Assign a scribe who timestamps every decision, severity change and action in the incident channel.

🏛 Senior insight: trade-offs

Severity is a communication and staffing tool, not a scorecard. Mature teams keep the scale small (four levels), tie each level to concrete actions, and review mis-classified incidents in postmortems. They also watch the direction of corrections: some downgrades are expected when the team follows 'declare high' — it shows people aren't afraid to escalate — but downgrades should follow evidence about impact, not pressure to make the numbers look better. Frequent upgrades are the bigger warning sign: triage is too optimistic and incidents are under-staffed in their first minutes.

Practice When it fits Cost When not
Dedicated IC rota Several teams, frequent Sev 1/2 Training, rota time A five-person team — the EM or a senior can be IC
Automatic severity suggestion High alert volume Rules to maintain As a replacement for human judgement
Public status page External customers Discipline in updates Internal-only tools

🔗 Follow-ups the interviewer may ask

  1. When: Candidate jumps into triage without placing it in the wider process. Why: Checks the candidate sees triage as one stage of a lifecycle.
    How to answer

    An incident moves through detect → triage → mitigate → resolve → review. Detection should come from alerts on customer-facing symptoms (error rate, latency, SLO burn), not from customers ringing support. Triage decides how bad it is (severity), who leads it (the incident commander) and who else is needed. Mitigation stops the customer pain as fast as possible — roll back, turn a feature flag off, fail over — guided by a working hypothesis about what changed, without waiting for a proven root cause. Resolution is when the SLIs are back inside their SLOs and stay there. Review is the blameless postmortem that produces owned, dated fixes. Communication to stakeholders runs through every stage.

    The timestamps between the stages give you time to detect, time to mitigate and time to resolve. The main trade-off is speed versus understanding: you restore service first and investigate second.

  2. When: Candidate mentions alert severities and paging routes. Why: Checks how alert design connects to incident severity.
    How to answer

    Alert on symptoms users feel, such as the request error-rate or latency SLI, failed synthetic journeys or orders per minute dropping, because causes like CPU at 80% often hurt nobody and miss failures with no resource signal at all. The best symptom alert is SLO burn rate: how fast you are spending the error budget. With a 99.9% SLO, a 14.4× burn over 1 hour (confirmed over 5 minutes) spends 2% of a 30-day budget and pages; 6× over 6 hours pages; slower burns raise a ticket.

    Every alert needs who gets paged (the owning team's rotation), the threshold and window, a severity that decides page versus ticket, a dashboard link and a runbook with the first mitigation steps. Cause metrics stay on dashboards for diagnosis. The trade-off: fewer pages means a slightly later warning for slow-building problems, which tickets cover.

  3. When: Candidate describes the ops lead's job. Why: Checks the candidate knows what the responders actually do after triage.
    How to answer

    Every minute of an outage costs customers, revenue and trust — for a busy checkout that can be thousands of dollars a minute — while the root cause can be found later from preserved telemetry. So responders ask "what changed?" and reach for the fastest, safest, reversible lever: roll back the release (an App Service slot swap or a previous container image), turn off the feature flag, scale out if it's genuinely capacity, fail over to Australia Southeast if a region is impaired, or shed load with rate limiting to protect the critical path.

    Good mitigation is rehearsed (a rollback you've never practised is a new risk), done one change at a time and verified against the SLIs. The trade-off is speed versus evidence: grab the evidence first when it costs seconds (a memory dump, a log export, a note of the deploy id), because a restart or rollback can destroy what explains the cause — but never delay mitigation by minutes to do it.

🛠 Real-world problems: how you handle them

Login outage under-classified as Sev 3
Situation
A [B2C web app] on Azure App Service with [around 40,000] daily users. After a certificate rollover at the identity provider, a share of logins failed. On-call initially logged it as Sev 3 because 'only some users' were affected.
Signals
Application Insights showed `401` responses from the token endpoint rising to 15% of sign-ins; support tickets about login tripled in 20 minutes; the login synthetic test from Australia East failed intermittently.
Investigation
KQL on `requests` and `exceptions` grouped by `operation_Name` and `cloud_RoleInstance` showed failures across all instances, ruling out a bad node. The deployment and configuration history showed the identity provider's signing key had rotated at the start time. Affected users were those whose cached metadata had expired.
Resolution
The IC upgraded to Sev 2, paged the identity team and assigned a comms lead. Immediate mitigation was to force a refresh of the OpenID Connect metadata by restarting instances in batches; long term the app's configuration manager refresh interval was shortened and key rollover is now tested in staging.
Prevention
Severity examples updated: 'any login failure above 5% is at least Sev 2'. A burn-rate alert on login success rate was added, with a runbook. Key rollover drills were added to the quarterly checklist.

How to tell it (STAR)

**S:** At [company], logins started failing for some users of our [product] after an identity provider key rollover, and it was first logged as a Sev 3. **T:** I was [on-call / the incident commander] and needed to size it properly and restore login. **A:** I checked the failure rate across instances in Application Insights, saw [15%] of sign-ins failing everywhere, upgraded to Sev 2, paged the identity team and asked [a colleague] to run comms so I could coordinate. We forced a metadata refresh with a rolling restart. **R:** Login success was back above [99.9%] within [25] minutes, and we changed our severity examples so any login failure above 5% is at least Sev 2.

↩ Usually asked after

More in Incident Response

Last updated 23 Nov 2026.

🌐 Sangam's Webring

⏪ Previous 🏠 Main Next ⏩
💬 Chat with me