How to summarise a main project for a non-technical recruiter in 60 seconds: what the system does, who uses it, the scale, your specific role and one outcome, without jargon.
Use What β Who β My part β Result, in about 60 seconds spoken, which is 120β160 words at a normal pace:
The recruiter needs to repeat it to a hiring manager, so plain words beat accuracy of detail. The trade-off: simplify enough to be understood, but keep one concrete number so it stays credible.
"The main project I work on is [the online portal that our business customers use to order stock and pay invoices]. About [3,000 businesses] use it, and it handles around [$X million] in orders a month, so when it's slow or down, people notice quickly.
I'm one of [five] developers on it, and I [own the ordering and payments part]. The biggest thing I did recently was [rebuild the checkout], because customers were [abandoning orders when it took too long]. I [redesigned how it talks to the payment provider and the warehouse system], and [checkout now takes a couple of seconds instead of about fifteen]. [Abandoned orders dropped by about X%.]
The technology is [Microsoft's .NET and the Azure cloud], but the part I enjoy most is [working with the customer service team to find out what's frustrating people and fixing it]."
| Part | Sentence count | Example shape |
|---|---|---|
| What | 1 | "It's the system [customers] use to [do X]." |
| Who and scale | 1 | "About [N] people use it, [volume] a [day/month]." |
| My part | 1β2 | "I [own / built / led] [part]." |
| Result | 1β2 | "I [changed X], so [outcome with number]." |
| Optional colour | 1 | Tech in plain words, or what you enjoy |
| Pick | Why |
|---|---|
| Your current, main project | Recruiters ask "what are you doing now?" |
| One where you had a clear part | Avoids "we did" answers |
| One with a measurable result | Gives the recruiter a number to pass on |
| One relevant to the role's domain | Easy to match against the brief |
If your current project is confidential, describe it generically: "[a large Australian insurer's] claims system" is fine without naming the client.
| Don't say | Say |
|---|---|
| "a microservices backend on AKS" | "the behind-the-scenes system, in the cloud" |
| "p95 latency" | "how long most people wait" |
| "idempotent retries" | "so payments never go through twice" |
A 60-second summary is about 120β160 words. It should contain exactly one number for scale and one for the result; recruiters frequently copy those two numbers straight into the candidate summary they send the client.
Checks whether the candidate understands the business purpose of their work and can explain their own contribution simply.
Green flags
Red flags
WHAT : purpose in customer words (1 sentence)
WHO : users + scale (1 sentence)
MY PART : what I own, in "I" statements (1-2 sentences)
RESULT : one change and its outcome (1-2 sentences)
This is a compressed CAR (Context, Action, Result): context = what and who; action = my part; result = the number.
Weak : architecture tour, no users, no personal role
Acceptable : clear purpose, vague role ("I worked on it")
Strong : purpose, scale, owned part, one outcome with a number
Excellent : the above in 60 seconds, with zero unexplained jargon
| Audience | Emphasise |
|---|---|
| Recruiter | Purpose, scale, your part, result |
| Hiring manager | Your part, how you worked with others |
| Technical panel | Design decisions, trade-offs, failure modes |
| Behavioural round | The same project becomes your achievement or incident story |
One well-known project can feed four or five answers. Keep the facts (numbers, dates, team size) consistent across all of them.
Under most employment contracts you can describe the type of work but not client names or internal figures. Use rounded or relative numbers ("about 40% faster") if absolute ones are sensitive.
A fill-in template:
WHAT "The main project I work on is [what it does for customers]."
WHO "About [N users/businesses] use it, [volume] a [day/month]."
MY PART "I'm one of [N] developers and I [own / built / led] [part]."
RESULT "Recently I [changed X] because [problem], and now [outcome + number]."
COLOUR "It's built on [.NET and Azure], but what I enjoy is [human angle]."
--- Illustrative example only (replace every bracket) ---
"It's the portal [3,000 businesses] use to order and pay. I own the
[checkout]; I rebuilt it so it takes [2 seconds instead of 15], and
abandoned orders fell [X%]."
A senior version shows business understanding: why the system matters, what it costs when it fails, and how your part moved a business number (revenue kept, cost saved, risk removed). It also shows ownership and leadership: "I own the payments side and [lead the two developers on it]" or "I [set up how the team tests releases]" is stronger than "I work on tickets". If you led or mentored on the project, say so in one clause and name the effect ("[the junior I mentored now owns the refunds module]").
| Option | When it fits | Cost | When not to |
|---|---|---|---|
| Current main project | Default | May be less impressive | If it started last month |
| Most impressive past project | Current one is new or confidential | Recruiter may ask why not current | When it's more than 3β4 years old |
| Generic description | Confidential client | Less memorable | When you can name the type safely |
| Business angle | Example phrase |
|---|---|
| Revenue | "abandoned orders fell [X%]" |
| Cost | "cut hosting costs [X%]" |
| Risk | "outages went from [monthly] to [none in a year]" |
Measure it by whether the recruiter can repeat it back; ask "does that make sense?" if unsure.
Tell it as a story with a clear arc: lead with impact (customers affected, money, risk), explain the cause with one plain analogy that fits your actual bug (for a race condition: "two staff members both picked up the same order and each shipped it"), describe your method without tool names ("I collected evidence and tested my theories one by one, with help from [the team]"), and finish with a business result and what you changed so it can't recur. Watch their reactions and offer technical depth rather than forcing it.
Pick a moment where the stakeholder had to decide something: delay a release, fund tech debt, accept a risk. Show that you framed it in their terms and quantified it (orders, dollars, customers, compliance), used one plain analogy, offered two or three options with cost, risk and time, gave your recommendation, and made the ask explicit.
If they pushed back, show you acknowledged their goal (the date, the budget) and returned to the numbers rather than arguing. Finish with how you checked understanding, the written follow-up and the outcome with a number. The trade-off is accuracy versus simplicity: simplify the mechanism, never the risk.
Last updated 23 Nov 2026.