📁 Sangam Dhakal - Portfolio v2.0 - Netscape Navigator 4.0
_
□
×

📚 Interview question

Tell me about a technical decision you had to make with incomplete information. How did you decide what you needed to know and what you could live without, how did you limit the downside, and how did it turn out?

Decision-making under uncertainty: reversible versus irreversible decisions, time-boxed investigation, making assumptions explicit, limiting blast radius, setting review triggers, and owning the outcome.

Senior Behavioral Advanced adr behavioral decision-making risk-management senior-expectations uncertainty

🎯 Key points

  • Classify the decision: reversible (two-way door) or irreversible (one-way door)
  • Time-box the investigation; decide what information would change the answer
  • Write down assumptions and the decision in an ADR
  • Limit blast radius: feature flags, abstractions, canary or pilot
  • Set a trigger or date to revisit
  • Own the outcome, including if it was wrong
  • Result and what you learned about deciding, not just the tech

⏱ 30-second answer

First I classify the decision: reversible (two-way door) or irreversible (one-way door). Reversible ones I make quickly and adjust. For irreversible ones I time-box investigation to the facts that would actually change the answer, write down my assumptions in an ADR, and limit the downside: a flag, an abstraction at the boundary, a pilot.

I set a trigger to revisit (a metric, a date). In the story, show the uncertainty, how you decided, how you hedged and what happened, even if you got it partly wrong. The trade-off: waiting for certainty is itself a decision, and usually a costly one.

🗣 Full answer (senior)

How I would answer this in an interview

"At [company] we had to choose [a message broker for a new integration platform], and we had [two weeks] before [the partner integration started]. We didn't know [the final message volumes, since the partner couldn't give us numbers], and the team was split between [Azure Service Bus and Kafka on Azure Event Hubs].

I started by asking what would change the decision. Volume mattered most: [above roughly N thousand messages a second, Service Bus costs and throughput would be a concern]. So I time-boxed [three days] for a load test of both at [10x our best estimate], and checked [the partner's historical file sizes] as a proxy. Both handled it; Service Bus fitted our [team's skills and the features we needed, like sessions and dead-lettering]. I wrote an ADR listing the assumptions [volume under N/s, ordering per customer], put the broker behind [a thin publishing interface], and set an alert at [70% of the throughput unit limit] as our trigger to revisit.

[Eighteen months] on, volume was [about a third of our upper estimate], and we've never needed to revisit it. If I'd waited for the partner's numbers, we'd have [started the integration a month late]. What I learned is to ask 'what would change my mind?' before collecting more data."


One-way vs two-way doors

Type Examples Approach
Two-way (reversible) Library choice behind an interface, UI layout, feature flags Decide fast, measure, adjust
One-way (hard to reverse) Public API contract, data model, cloud region for data residency, primary database Time-boxed investigation, ADR, review

Ways to limit the downside

Technique Effect
Abstraction at the boundary Makes a one-way door closer to two-way
Feature flag Turn off quickly
Pilot / canary Small blast radius
Explicit assumptions in ADR Know when the decision is invalid
Revisit trigger (metric or date) Avoid silent drift

Production example

"Deciding in [two weeks] instead of waiting [a month or more] for partner data kept the integration on schedule; actual volume came in at [~30% of our upper estimate], well inside the tested range."

🔍 What the interviewer is checking

Checks that the candidate makes timely, well-reasoned decisions under uncertainty and limits the downside.

Green flags

  • Distinguishes reversible from irreversible
  • Knows what information would change the answer
  • Hedges and records assumptions
  • Owns the outcome honestly

Red flags

  • Gut feel with no method
  • Paralysis or endless analysis
  • Blames the missing information

📚 Learn in depth

1. What is being assessed

  • Judgement under ambiguity: senior roles rarely have complete information.
  • Structured thinking: do you know what you need to know?
  • Risk control: do you hedge sensibly?
  • Accountability: do you own the outcome?

2. A decision process

Frame the decision ─► Reversible? ── yes ─► Decide now, measure, adjust
                           │
                           no
                           ▼
   What would change the answer? ─► Time-boxed investigation ─► Decide
                                                                   │
                    ADR (assumptions) + hedge (flag, abstraction) + revisit trigger

3. Frameworks

  • One-way / two-way doors (popularised by Amazon's shareholder letters).
  • The 70% rule: decide with about 70% of the information you wish you had; waiting for 90% is usually too slow.
  • Cynefin: in complex situations, probe-sense-respond (experiment) rather than analyse to death.
  • OODA loop: observe, orient, decide, act, then repeat.
  • ADR with explicit assumptions and a review date.

4. How it is scored

Level Looks like
Weak "I went with my gut and it worked"
Good Gathered information, decided, it worked
Strong Identified what mattered, time-boxed, hedged, recorded assumptions, measured outcome
Exceptional Plus honest reflection where an assumption was wrong and how the hedge saved them

5. Adapting the story

The same story answers "a time you took a calculated risk", "a time you had to move fast" and "a decision you'd make differently". A partly-wrong outcome with a good hedge is often a better story than a perfect one.

Try it yourself

  1. List three decisions you made last year and classify each as one-way or two-way.
  2. For one, write what information would have changed the answer.
  3. Write the hedge you used, or should have.
  4. Draft an ADR with an assumptions section and a revisit trigger.
  5. Rehearse the story in two minutes.

💻 Code

Fill-in template (not code):

S  At [company], we had to decide [decision] by [deadline]; unknown: [missing info].
T  I was responsible for [the recommendation / the decision].
A  I asked what would change the answer: [key factor].
   Time-boxed [N days] for [spike / load test / proxy data].
   Decided [option]; ADR with assumptions [A, B]; hedged with [abstraction / flag / pilot];
   revisit trigger [metric threshold / date].
R  [Outcome after time]; waiting would have cost [X]. I learned [lesson about deciding].

Illustrative only:

Broker choice with unknown volume; 3-day load test at 10x estimate.
Service Bus behind a publishing interface; alert at 70% of capacity.
Actual volume ~30% of the upper estimate; integration started on time.

⚠ Common mistakes

  • Mistake: "I went with my gut." Why it is wrong: shows no method. Instead: explain how you decided what mattered.
  • Mistake: Waiting for certainty. Why it is wrong: delay is a decision with its own cost. Instead: time-box and decide.
  • Mistake: Treating every decision as irreversible. Why it is wrong: slows the team. Instead: move fast on two-way doors.
  • Mistake: No hedge. Why it is wrong: the downside is unbounded. Instead: flag, abstraction, pilot.
  • Mistake: Only telling stories where you were right. Why it is wrong: sounds lucky or rehearsed. Instead: show what you'd adjust.
  • Mistake: Not recording assumptions. Why it is wrong: nobody knows when to revisit. Instead: ADR with assumptions and trigger.
  • Mistake: Long technical comparisons for a mixed panel. Why it is wrong: loses the point. Instead: one line on the options, focus on how you decided.

🏛 Senior insight: trade-offs

A senior answer shows you matched the effort to the reversibility of the decision, converted uncertainty into explicit assumptions, and designed a way out. Owning a partly-wrong call calmly is a strong signal.

Approach When it fits Cost When not to
Decide now, adjust Reversible, low blast radius Some rework Data model, public contracts
Time-boxed spike Key unknown is testable Days Unknown isn't testable cheaply
Pilot / canary Customer-facing change Slower rollout Urgent fixes
Defer with a date Info is genuinely coming soon and delay is cheap Schedule Delay blocks others

Measure decision quality by process and hedges, not just by outcome.

🔗 Follow-ups the interviewer may ask

  1. When: Candidate mentions writing an ADR. Why: Checks how they record assumptions and revisit decisions.
    How to answer

    An architecture decision record (ADR) is a short document capturing one significant decision: the context, the decision, its status and its consequences, including the options you rejected.

    • Write one when a decision is hard to reverse, affects several teams or modules, or will be questioned later: choosing a message broker, an auth approach, a multi-tenancy model.
    • Keep them as numbered Markdown files in the repository, reviewed in a pull request like code.
    • Once accepted they are immutable: when the decision changes you write a new ADR that supersedes the old one.

    The trade-off: an ADR costs an hour to write but saves weeks of re-arguing or reverse-engineering a decision. Writing them for trivial choices kills the habit.

  2. When: Candidate mentions hedging or a revisit trigger. Why: Checks how they manage the risks the decision created.
    How to answer

    I look for risk in unknowns, dependencies, integration points, performance, compliance and people (key-person risk). I size each by likelihood and impact and attack the top few early: spikes, a walking skeleton through every layer, and doing the riskiest work first.

    I raise risks early and in writing, with options and a recommendation, and track them in a RAID log reviewed each sprint. In the example, show how you spotted it, who you told, what changed, and what that saved. The trade-off: crying wolf erodes trust, so I raise risks with evidence and a proportionate response.

  3. When: Candidate's decision turned out perfectly. Why: Checks honesty when a decision turned out wrong.
    How to answer

    Choose a real mistake with real but moderate impact, not a humblebrag ("I work too hard"). Say plainly what you did wrong in first person, how you contained it (rollback, feature flag, data correction) and told people early, and the honest impact.

    Then spend the most time on the systemic fix: a test, a pipeline check, a review step, rather than "I'll be more careful", and show the lesson applied later. Panels assess accountability and learning. The trade-off is candour versus self-protection: be honest about the mistake, but choose one that doesn't question your core competence for the role.

🛠 Real-world problems: how you handle them

Choosing a message broker before the volumes were known
Situation
[New integration platform] for [partner feeds]; volumes unknown; [two weeks] before partner work started; team split between [Service Bus] and [Event Hubs/Kafka].
Signals
No partner volume data; [conflicting estimates]; deadline pressure from [the partner programme].
Investigation
Identified volume as the deciding factor; 3-day load test of both at 10x estimate; partner historical file sizes as a proxy; cost estimate in Australia East.
Resolution
Chose Service Bus behind a thin publishing interface; ADR with assumptions; alert at 70% of capacity as the revisit trigger.
Prevention
ADR review date; capacity alert; quarterly check of actual volume vs assumptions.

How to tell it (STAR)

**S:** At [company], we had [two weeks] to choose a broker for [a partner integration] and the partner couldn't give us volumes. **T:** I owned the recommendation. **A:** I asked what would change the answer, which was volume, so I time-boxed [three days] to load test both options at ten times our best estimate. I chose [Service Bus], recorded the assumptions in an ADR, put it behind a small interface and set an alert at [70%] of capacity to tell us when to revisit. **R:** The integration started [on time], and [18 months] later volume was [about 30%] of our upper estimate. I learned to ask what would change my mind before gathering more data.

More in Senior Engineer Expectations

Last updated 23 Nov 2026.

🌐 Sangam's Webring

⏪ Previous 🏠 Main Next ⏩
💬 Chat with me