📁 Sangam Dhakal - Portfolio v2.0 - Netscape Navigator 4.0
_
□
×

📚 Interview question

During a major incident, how do you communicate with engineering managers, executives, customer support and customers? How often do you send updates, what goes in each one, what do you never say or promise, and how do you keep communication from slowing down the people fixing the problem?

Covers incident communication: audiences and channels (internal stakeholders, support, status page, customers), update cadence by severity, the structure of an update (impact, what we know, what we're doing, next update time), avoiding ETAs and blame, separating the comms role from the fix, regulatory communication under the NDB scheme, and the final resolution message.

Senior Behavioral Advanced incident-communication incident-response leadership production stakeholder-management status-page

🎯 Key points

  • Name a comms lead so investigators are shielded, but draft technical facts with the ops lead for accuracy
  • Fixed cadence by severity (e.g. Sev 1 every 30 min, Sev 2 every 60 min); always state the next update time, even 'no change'
  • Update template: impact in customer terms, status, what we're doing, workaround, next update
  • No fix ETAs and no root-cause speculation; promise the next checkpoint, not the fix
  • Different messages per audience: executives (impact, risk, decisions), support (symptoms, workaround, script), customers (plain-language status page)
  • Only verified facts externally; no blame of individuals or vendors
  • Suspected personal data exposure: privacy officer and legal own that messaging from the moment it's suspected; NDB assessment within 30 days
  • Resolution message with duration and impact, then a written review that includes how communication went

⏱ 30-second answer

I separate fixing from telling: a named comms lead owns updates so the investigators aren't interrupted, but drafts the technical facts with the ops lead so every update is accurate. Updates go out on a fixed cadence set by severity (for example every 30 minutes for a Sev 1) and each one ends with when the next update is, even if nothing has changed: consistency is what keeps trust.

Every update has the same shape: impact in customer terms, what we know, what we're doing, any workaround, next update time. Executives want impact and decisions, support wants symptoms and a script, customers want plain language on the status page. I never promise a fix time or speculate on root cause, and never blame a person or a vendor in public. It ends with a resolution message and a written review that also asks how the comms went. The trade-off: say less, but say it on time and make sure it's true.

🗣 Full answer (senior)

How I would answer this in an interview

"In an incident, silence is the thing stakeholders hate most. If support hears nothing for 40 minutes, they start messaging engineers directly, the general manager calls the team lead, and suddenly the people who should be fixing the problem are writing status reports. So I treat communication as its own workstream with its own owner. The comms lead sends updates on a fixed rhythm — every 30 minutes for a Sev 1, hourly for a Sev 2 — and every update says when the next one is. That rhythm is what buys the engineers quiet.

For example, at [company] we had [a three-hour degradation of our payments API caused by a downstream provider]. I was [incident commander / comms lead]. I set up three streams: a short executive summary in [the leadership channel] with impact in dollars and customers and any decisions we needed from them, a support update with the exact symptoms, a workaround and a script for the phones, and a status page entry in plain language. Early on an executive asked me when it would be fixed. I said, 'I can't give you a fix time yet without guessing, but I can tell you we'll know by 2:30 whether failing over works, and you'll hear from me then.' That kept trust when the first fix didn't work. Afterwards support told us [call volume was about 40% lower than in a similar incident] because they had something to say to customers.

The mistake I see is promising an ETA to make the pressure go away. When you miss it, you lose credibility for the rest of the incident. Promise the next update, not the fix."


Audiences and what they need

Audience Channel What they need Avoid
Executives, GM Leadership channel, short call if Sev 1 Impact (customers, revenue, reputation), risk, decisions needed from them Technical detail, raw logs
Engineering managers Incident channel (read-only for them) Status, staffing needs Pulling responders into side chats
Customer support Support channel, knowledge base article Symptoms, who is affected, workaround, customer script Internal jargon, root-cause guesses
Customers Status page, in-app banner, email for major incidents Plain-language status, workaround, next update Blame, technical speculation, fix times
Regulators, privacy officer Through legal or privacy team Whether personal information is involved Engineers talking to regulators directly

Cadence by severity

Severity Internal update Status page Executive call
Sev 1 Every 30 minutes Within 15 minutes of declaring, then every 30–60 minutes Yes, at declaration and on major changes
Sev 2 Every 60 minutes If customers notice Summary only
Sev 3 At start and end Usually not No

The update template

Part Example
Impact About 1 in 5 card payments are failing for customers in Australia.
Status Investigating / Identified / Mitigating / Monitoring / Resolved
What we're doing We're switching card payments to our backup provider.
Workaround Customers can pay with PayPal, which is working normally.
Next update 2:30 pm AEDT, or sooner if things change.

What I never say

Don't say Say instead
"It'll be fixed in 20 minutes" "Our next update is at 2:30, when we'll know whether the failover worked"
"The vendor broke it" "A third-party service we use is having problems"
"A developer deployed a bad change" "A recent change caused the problem; we've reversed it"
"No data was affected" (before you know) "We're checking whether any data was affected and will confirm"

Production example

In the [payments degradation], the comms lead sent [seven] updates in [three] hours, all on time. Support escalations to engineering dropped from [a dozen] in a previous incident to [one], and the status page entry got [no] complaints about missing information in the post-incident customer survey.

🔍 What the interviewer is checking

Checks whether the candidate can manage stakeholders under pressure: clear, regular, honest updates that fit the audience, without over-promising or distracting the responders.

Green flags

  • Separates the comms role from the fix
  • Fixed cadence with the next update time in every message
  • Tailors messages for executives, support and customers
  • Refuses to give fix ETAs; offers checkpoints instead
  • Knows when legal or the privacy officer must be involved

Red flags

  • "We just told them when it was fixed"
  • Promises a fix time to calm people down
  • Blames a person or vendor in customer messages
  • Technical jargon in customer-facing updates

📚 Learn in depth

1. Why communication is part of the fix

An incident has two problems: the technical fault and the uncertainty around it. Uncertainty causes its own damage: support can't answer customers, sales promises things it shouldn't, executives escalate, and engineers get interrupted. Good communication reduces that damage even before the fault is fixed.

      Incident commander
        /           \
  Ops lead        Comms lead
 (fix the        (reduce the
  fault)          uncertainty)
                 /    |     \
           execs  support  status page

2. Cadence beats content

People tolerate "no change" updates far better than silence. A fixed cadence, announced in each update, means stakeholders stop asking. If the cadence slips, the comms lead sends a one-liner ("still working on it, no change, next update 3:00") rather than nothing.

3. Writing for each audience

  • Executives think in impact and decisions. Translate: "error rate 18% on POST /payments" becomes "about one in five card payments is failing, roughly [$X] an hour in sales". Ask for decisions explicitly: "Do we want to turn off promotions to reduce load?"
  • Support needs a script: what customers will see, who is affected, what to tell them, and the workaround.
  • Customers need plain language with no internal names. Status page states (Investigating, Identified, Monitoring, Resolved) are a common shared vocabulary from tools such as Atlassian Statuspage, incident.io and Better Stack.

4. Why no ETAs

Incident duration is very hard to predict: the first hypothesis is often wrong. An ETA that's missed damages trust in all later updates. Instead promise checkpoints: "We'll know by 2:30 whether the failover works." This gives stakeholders something concrete without a commitment you can't keep.

5. Facts, not speculation or blame

Everything sent externally may end up in a complaint, a news story or a contract dispute. Stick to verified facts. Never name an individual. Name a vendor only when it's agreed and accurate, and usually only in the final review. Be careful with "no data was affected": only say it when you've checked.

6. Australian regulatory communication

If personal information might have been accessed or disclosed, the privacy officer and legal team take over external messaging on that point. Under the Privacy Act 1988 the organisation must assess a suspected eligible data breach within 30 days and notify the OAIC and affected individuals if serious harm is likely. Critical infrastructure entities may also have reporting duties under the Security of Critical Infrastructure Act 2018 (for example notifying the ACSC of significant cyber incidents within 12 or 72 hours depending on impact). Engineers supply facts; they don't decide what is notified.

7. Closing communication

The resolution message states what happened in plain terms, when impact started and ended, who was affected, and that a written review will follow by a date. For major customers, a post-incident report a week later closes the loop and often restores more trust than the outage cost.

Try it yourself

  1. Write a status page entry for a hypothetical outage in fewer than 60 words, with no jargon.
  2. Take an internal incident channel from a past incident and write the executive summary an outsider would need.
  3. Draft your team's update template and pin it in the incident channel template.
  4. Role-play an executive demanding an ETA; practise answering with a checkpoint instead.
  5. Review a public cloud provider's status history and note which updates kept trust and which didn't.

💻 Code

A small update builder the comms lead uses so every message has the same parts and always includes the next update time:

namespace Incidents;

public enum Audience { Executive, Support, Customer }
public enum Status { Investigating, Identified, Mitigating, Monitoring, Resolved }

public sealed record IncidentUpdate(
    Status Status,
    string ImpactInCustomerTerms,
    string WhatWeAreDoing,
    string? Workaround,
    DateTimeOffset NextUpdateAt,
    string? DecisionNeeded = null);

public static class UpdateWriter
{
    private static readonly TimeZoneInfo Sydney = TimeZoneInfo.FindSystemTimeZoneById("Australia/Sydney");

    public static string Write(IncidentUpdate u, Audience audience)
    {
        var next = TimeZoneInfo.ConvertTime(u.NextUpdateAt, Sydney);
        var nextLine = u.Status == Status.Resolved
            ? "A written review will follow."
            : $"Next update by {next:h:mm tt} Sydney time, or sooner if anything changes.";

        return audience switch
        {
            Audience.Executive =>
                $"[{u.Status}] {u.ImpactInCustomerTerms}\nAction: {u.WhatWeAreDoing}\n" +
                (u.DecisionNeeded is null ? "" : $"Decision needed: {u.DecisionNeeded}\n") + nextLine,
            Audience.Support =>
                $"[{u.Status}] Customers may see: {u.ImpactInCustomerTerms}\n" +
                $"Tell customers: {u.Workaround ?? "we're working on it and will update the status page"}\n" + nextLine,
            // Customer text deliberately has no internal detail and no fix time.
            Audience.Customer =>
                $"{u.Status}: {u.ImpactInCustomerTerms} {u.Workaround} {nextLine}".Trim(),
            _ => throw new ArgumentOutOfRangeException(nameof(audience))
        };
    }
}

⚠ Common mistakes

  • Mistake: Engineers fixing the problem also field every status question. Why it is wrong: Investigation slows and messages are inconsistent. Instead: Route questions through a comms lead, who gets technical facts from the ops lead at each check-in so updates stay accurate.
  • Mistake: Giving a fix ETA under pressure. Why it is wrong: The first hypothesis is often wrong; a missed ETA destroys trust. Instead: Promise the next update or a checkpoint.
  • Mistake: Going silent because there's nothing new. Why it is wrong: Silence makes stakeholders escalate and guess. Instead: Send a short "no change, next update at …" on schedule.
  • Mistake: The same technical message to everyone. Why it is wrong: Executives can't act on stack traces; customers are confused by jargon. Instead: Tailor impact and asks per audience.
  • Mistake: Blaming a person or vendor publicly. Why it is wrong: It is often wrong early on, damages relationships and can create legal exposure. Instead: Describe facts and the fix; leave cause to the written review.
  • Mistake: Saying "no data was affected" before checking. Why it is wrong: If it turns out false, it damages trust and complicates a Notifiable Data Breaches response. Instead: "We're checking and will confirm," and bring in the privacy officer as soon as exposure is suspected, not once it's confirmed.
  • Mistake: No resolution message or follow-up report. Why it is wrong: Stakeholders don't know it's over or what changed. Instead: Send a resolution note with duration, impact and the date of the written review, and review the comms themselves in the postmortem.

🏛 Senior insight: trade-offs

Seniors treat communication as risk management: the goal is to keep trust intact so the business can make decisions. That means picking a cadence and sticking to it, translating technical facts into business impact, and pushing decisions to the people who own them ("Do we pause the marketing email?" is an executive call, not an engineering one).

Measure it: did updates go out on time, how many escalations reached engineers directly, and what did support and customers say afterwards?

Channel When it fits Cost When not
Incident channel only Sev 3, internal impact Free Anything customers notice
Status page Customer-visible degradation Needs discipline to update Internal-only issues; minor blips that would cause alarm
Direct email to key customers Major outage, enterprise contracts Account managers' time Small incidents: over-communication causes worry
Executive bridge call Sev 1, financial or reputational risk Senior people's time Sev 2/3: a written summary is enough

🔗 Follow-ups the interviewer may ask

  1. When: Candidate mentions personal data or customer data during an incident. Why: Checks the candidate knows when an incident becomes a privacy matter and who communicates then.
    How to answer

    Contain first: disable the feature or purge the cache. Tell the privacy officer straight away and follow the organisation's data breach response plan. Under the Privacy Act 1988 NDB scheme, a suspected eligible breach must be assessed within 30 days; if it is likely to cause serious harm and remedial action hasn't removed the risk, notify the OAIC and affected individuals as soon as practicable. Engineers provide the facts: which fields, how many people, which recipients, the time window, and evidence from audit and response logs. Document every step and decision, and preserve evidence: don't delete logs. Failing to assess or notify is an interference with privacy, and serious interferences can attract large civil penalties since the 2022 amendments.

  2. When: Candidate says they told executives the impact. Why: Checks the candidate can work out the impact numbers that go into executive updates.
    How to answer

    Blast radius is the impact across several dimensions: the time window, who was affected (users, customers, tenants, regions), what failed (requests, orders, payments), money, and data, both corrupted and exposed. I give a quick estimate with a range within the hour from telemetry, then exact numbers later. The impact window comes from SLI telemetry, and distinct affected users from request telemetry keyed on an authenticated user or customer id, using KQL in Application Insights. Failed requests aren't the whole story, so I reconcile the database for duplicates, missing or wrong records. If personal data may have been exposed, the clock starts on a Notifiable Data Breaches assessment under the Privacy Act 1988 (30 days at most). The trade-off: speed versus precision, so I always state assumptions and confidence.

  3. When: Candidate says they never give ETAs. Why: Checks composure and managing upward under pressure.
    How to answer

    I acknowledge the pressure first: they're asking because customers, revenue or the board are on their mind. Then I explain in one sentence that any fix time now would be a guess, and offer a checkpoint instead: "We'll know by 2:30 whether failing over works, and I'll tell you then." I give them what they can use: impact, workaround, risk, and any decision only they can make (pause a campaign, approve a failover cost).

    Then I agree a cadence and a channel: the comms lead will update them every 30 minutes, so they don't need to call. If they still call, I politely route them to the comms lead or IC so investigators stay focused. Afterwards the review asks why they felt they had to call, usually because they weren't on the update list early enough. The trade-off: a few minutes spent on them now saves many interruptions later.

🛠 Real-world problems: how you handle them

Three-hour payments degradation from a downstream provider
Situation
[An online retailer] in Australia processing [about $40,000 an hour] in card payments through [a payment provider]. At [1:15 pm] on a weekday, [about 20%] of card payments started failing.
Signals
Burn-rate alert on payment success rate; Application Insights dependency telemetry showing timeouts to the provider; support queue up [3x] within 20 minutes; the general manager messaging the team lead asking what was happening.
Investigation
The ops lead confirmed via dependency metrics (KQL over `dependencies` by `target` and `resultCode`) that the provider was timing out, and the provider's own status page confirmed a partial outage. I, as comms lead, gathered impact from the payments dashboard: failure rate, affected revenue per hour, and the fact that PayPal was unaffected.
Resolution
Immediate: set a 30-minute cadence; sent an executive summary with impact in dollars and a decision request (pause the marketing email due at 2 pm — agreed); gave support a script with PayPal as the workaround; posted the status page entry. The ops team failed over to the backup provider at [2:40 pm]; the provider recovered at [4:10 pm]. Resolution message at [4:30 pm], written review a week later.
Prevention
An update template pinned in the incident channel; a comms lead role on every Sev 1/2 rota; pre-approved status page wording for common failures; a quarterly review of incident comms with support.

How to tell it (STAR)

**S:** At [company], [a payment provider] partially failed and about [one in five] card payments were failing for [three hours]. **T:** I was [comms lead / IC] and needed to keep executives, support and customers informed without pulling the engineers away from the failover. **A:** I set a 30-minute cadence, wrote separate updates for leadership with impact in dollars and a decision to pause a marketing email, a script for support with PayPal as a workaround, and plain-language status page entries. When asked for a fix time I offered a checkpoint instead. **R:** All [seven] updates went out on time, escalations to engineers dropped from [about a dozen] last time to [one], and support call volume was [about 40%] lower than in a similar incident.

↩ Usually asked after

More in Senior Responsibilities

Last updated 23 Nov 2026.

🌐 Sangam's Webring

⏪ Previous 🏠 Main Next ⏩
💬 Chat with me